Location: Mwanza, Dodoma, Tanga, Morogoro, Iringa & Mbeya
Capabilities: 1318km of 33kV lines
Timetable: Contract awarded in September, 2010
Status: In progress
Distribution network
The project entails the design of all encompassing network extensions including the reinforcement of the existing networks, creating interconnections between substations, and extending the existing network to connect households and businesses that previously did not have access to electrical power.
This project includes the extension and rehabilitation of existing lines in six regions of Tanzania:
Training local People
Symbion is committed to using local labor and will train its local work force. This training will increase the skill set of a limited labor pool. We will provide line construction training with the assistance of the Northwest Lineman College, Idaho, at a training facility in Morogoro, Tanzania.