Location: Dodoma, Tanzania
Capabilities: 50MW Diesel Engine Plant
Timetable: Four weeks fast track
Status: Connected November 2011
Located in Tanzania's capital city of Dodoma, the new 50MW Symbion Power Plant was a fast-track project completed in only four short weeks.
When fully operational, the Symbion plant will provide power to the entire Dodoma region, relieving stress on the grid in other areas, including Dar es Salaam, while freeing up power and reducing load shedding.
This 50MW thermal plant utilizes diesel engines and is part of the total additional 250MW that will be incrementally added to the existing 112MW, bringing the total megawatts produced by Symbion in Tanzania to 317.



The next plant is scheduled for Arusha with completion prior to year end.